Sloping blocks are common in ACT and Googong. The cost impact comes from a few predictable areas.
The real cost drivers
- Cut/fill volume and spoil removal
- Retaining walls and drainage
- Step-down slabs vs split levels
- Access and temporary works
How we control slope costs
We design for buildability: reduce unnecessary cut, keep retaining practical, and align finished floor levels to contours.
Practical tip
Ask for a concept that shows how the block is ‘solved’ — levels, retaining, and drainage — not just a floorplan.
Want us to review your block? Book online.